[1]
De Carvalho Belo, G.B. 2025. Lean Management Implementation to Improve Productivity and Efficiency in Electrical Construction Projects: A Case Study at Bozer Construction Unipessoal LDA, Timor Leste. International Journal of Economics (IJEC). 4, 2 (Jul. 2025), 1081–1085. DOI:https://doi.org/10.55299/ijec.v4i2.1459.