Lean Management Implementation to Improve Productivity and Efficiency in Electrical Construction Projects: A Case Study at Bozer Construction Unipessoal LDA, Timor Leste
Main Article Content
Abstract
This study aims to evaluate the implementation of Lean Management principles and their impact on productivity and efficiency in electrical construction projects, focusing on a case study at Bozer Construction Unipessoal LDA in Timor Leste.The research employs a qualitative descriptive method using a single embedded case study design. Data were collected through semi-structured interviews with key project staff, direct field observations, and analysis of internal project documentation.The study found that Lean tools—specifically Just-In-Time (JIT), Kaizen, and Total Quality Management (TQM)—significantly contributed to minimizing waste, improving scheduling accuracy, and enhancing workforce coordination. However, challenges were encountered, including limited knowledge of Lean concepts, cultural resistance to bottom-up improvement processes, and logistical barriers in maintaining timely material delivery.Despite constraints, the adoption of Lean strategies yielded measurable performance improvements: reduced project delays, enhanced material efficiency, and improved quality control. This case illustrates that Lean Management can be adapted effectively even in resource-constrained, post-conflict settings like Timor Leste.This study contributes to the limited empirical literature on Lean Construction in Southeast Asia, offering practical insights for similar developing country contexts. It demonstrates that local adaptation and incremental implementation of Lean principles can lead to substantial gains in project delivery performance
Downloads
Article Details

This work is licensed under a Creative Commons Attribution 4.0 International License.
References
Amalia, N., Nabila, U., & Abbas, F. M. (2024). Penerapan Lean Construction dalamsistemmanajemenmutukonstruksi. JurnalRekayasaIndustri, 18(1), 102–120.
Anggraeni, D., &Setiawan, A. (2021). Lean Management dalamKonstruksi: StudiKasus pada Proyek Jalan Tol. JurnalKonstruksi dan Manajemen, 7(2), 45–60.
Fauzi, A. (2023). Implementasi Lean Construction untukmeningkatkanefisiensiproyekkonstruksi. JurnalManajemenKonstruksi, 12(3), 45–60.
Gunawan, S., & Sari, W. (2023). OptimasiBiayadalamProyekKonstruksiMenggunakan Lean Principles. Jurnal Teknik Sipil, 14(2), 121–133.
Hidayat, A., &Syafitri, M. (2023). Penerapan Lean Construction untukmengurangidurasiproyekkonstruksi. Jurnal Teknik Sipil, 14(2), 35–48.
ISO. (2015). ISO 9001:2015 quality management systems – Requirements. International Organization for Standardization.
Kusuma, H., & Mariana, L. (2022). Just in Time dalamPengadaan Material Konstruksi. JurnalKonstruksi Indonesia, 11(2), 77–88.
Liker, J. K. (2004). The Toyota Way: 14 Management Principles from the World’s Greatest Manufacturer. McGraw-Hill.
Maulana, M., Suhendar, E., &Prasasty, A. T. (2021). PenerapanLean Management untukMeminimasi Waste pada LiniProduksi. Jurnal Teknik Industri, 6(3), 150–165.
Ministerio das ObrasPúblicas Timor Leste. (2020). Laporanpengembanganinfrastrukturkelistrikan di Timor Leste.
Pratama, A., &Syafira, N. (2021). Penerapan 5S dalamProyekKonstruksisebagaiBagiandari Lean Management. JurnalManajemenProyek, 5(2), 66–75.
Prasetyo, H., &Rahmat, A. (2022). EvaluasiPenerapan Last Planner System dalam Lean Construction. Jurnal Teknik dan Perencanaan, 10(1), 89–103.
Saputra, D., & Pertiwi, I. (2020). AnalisisPengaruh Lean Thinking terhadapProduktivitasKonstruksi. JurnalRekayasaProyek, 11(1), 32–44.
Saputra, G., & Lestari, M. (2020). Lean Construction dan Efisiensi Waktu dalamProyekInfrastruktur. JurnalKonstruksi Listrik, 11(2), 78–89.
Santoso, B., &Mulyani, R. (2020). Analisisefektivitas Lean Construction dalampengelolaanproyek. Jurnal Teknik Sipil, 15(2), 78–95.
Wibowo, E., &Ramadhani, T. (2022). Integrasi Lean dan BIM dalamManajemenProyekKonstruksi. Seminar Nasional Teknologi dan Rekayasa, 7(2), 89–102.
Wijaya, A., &Dewi, R. (2021). PenerapanKaizendalammeningkatkanefisiensiproyekkonstruksi. ProsidingKonferensi Nasional Teknik Industri, 5(1), 112–125.
Womack, J. P., Jones, D. T., &Roos, D. (1990). The Machine That Changed the World: The Story of Lean Production. Free Press.
Prasetyo, A. R., &Prasetya, Y. (2021). EvaluasiEfisiensi dan ProduktivitasProyekKonstruksi. JurnalManajemenKonstruksi Indonesia, 4(1), 20–35.
Shingo, S. (1989). A study of the Toyota production system from an industrial engineering viewpoint. Productivity Press.
Tommelein, I. D., & Ballard, G. (1997). Coordination of work tasks at the project level. Construction Management and Economics, 15(3), 255–264.
Imai, M. (1986). Kaizen: The key to Japan’s competitive success. McGraw-Hill.
Oakland, J. S. (2014). Total Quality Management and operational excellence: Text with cases (4th ed.). Routledge.
Juran, J. M., & Godfrey, A. B. (1998). Juran’s quality handbook (5th ed.). McGraw-Hill.
Pheng, L. S., & Teo, J. A. (2004). Implementing Total Quality Management in construction firms. Journal of Management in Engineering, 20(1), 8–15. https://doi.org/10.1061/(ASCE)0742-597X(2004)20:1(8)